Abstract:
In this paper, we have developed an inventory model for deteriorating items withprice and time dependentdemand considering inflation effect on the system. Shortages ifany are allowed and partially backlogged with a variable rate dependent on the durationof waiting time up to the arrival of next lot. The corresponding problem has beenformulated as a nonlinear constrained optimization problem, all the cost parameters arecrisp valued and solved. A numerical example has been considered to illustrate the modeland the significant features of the results are discussed. Finally, based on these examples,a sensitivity analyses have been studied by taking one parameter at a time keeping theother parameters as same.
Keywords:
Inventory,deterioration,partially backlogged shortages ,permissible delay in payment,
Refference:
I.C.W. Haley, H.C. Higgins, Inventory policy and trade credit financing, Manage.Sci. 20 (1973) 464-471.
II.S.K. Goyal, Economic order quantity under conditions of permissible delay inpayments, J. Oper. Res. Soc. 36 (1985) 35–38.
III.S.P. Aggarwal, C.K. Jaggi, Ordering policies of deteriorating items underpermissible delay in payments, J. Oper. Res. Soc. 46 (1995) 658–662.
IV.A.M.M. Jamal, B.R. Sarker, S. Wang, An orderingpolicy for deteriorating itemswith allowable shortages and permissible delay inpayment, J. Oper. Res. Soc. 48(1997) 826-833.
V.H. Hwang, S.W. Shinn, Retailer’s pricing and lotsizing policy for exponentiallydeteriorating products under the condition ofpermissible delay in payments,Comp. Oper. Res. 24 (1997) 539–547.
VI.C.T. Chang, L.Y. Ouyang, J.T. Teng, An EOQ model for deteriorating items undersupplier credits linked to ordering quantity, Appl. Math. Model. 27 (2003) 983–996.
VII.P.L. Abad, C.K.Jaggi, A joint approach for setting unit price and the length of thecredit period for a seller when end demand is price sensitive, Int. J. Prod. Econ. 83(2003) 115–122.
VIII.L.Y. Ouyang, K.S. Wu, C.T. Yang, A study on an inventory model for noninstantaneous deteriorating items with permissible delay in payments, Comp. Ind.Eng. 51 (2006) 637–651.
IX.Y.F. Huang, An inventory model under two levels of trade credit and limitedstorage space derived without derivatives, Appl. Math. Model. 30 (2006) 418–436.
X.Y.F. Huang, Economic order quantity under conditionally permissible delay inpayments, Euro.J.Oper.Res.176 (2007) 911–924.
XI.Y.F. Huang, Optimal retailer’s replenishment decisions in the EPQ model undertwolevels of trade credit policy, Euro.J.Oper.Res.176 (2007) 1577–1591.
XII.B. Das, K. Maity, M. Maiti, A two warehouse supply-chain model underpossibility/necessity/credibility measures, Math. Comp. Model. 46 (2007) 398–409.
XIII.B. Niu, J.X. Xie, A note on Two-warehouse inventory model with deteriorationunder FIFO dispatch policy, Euro. J. Oper. Res. 190 (2008) 571-577.
XIV.M. Rong, N.K. Mahapatra, M. Maiti, A twowarehouse inventory model for adeteriorating item with partially/fully backlogged shortage and fuzzy lead time,Euro. J. Oper. Res. 189 (2008) 59–75.
XV.J.K. Dey, S.K. Mondal, M. Maiti, Two storage inventory problem with dynamicdemandand interval valued lead-time over finite time horizon under inflation andtime-value of money, Euro. J. Oper. Res. 185 (2008) 170–194.
XIV.T.P. Hsieh, C.Y. Dye, L.Y. Ouyang, Determining optimal lot size for a twowarehouse system with deterioration and shortagesusing net present value, Euro.J. Oper. Res. 191 (2008) 182-192.
XVII.M.K. Maiti, Fuzzy inventory model with two warehouses under possibilitymeasure on fuzzy goal, Euro. J. Oper. Res. 188 (2008) 746–774.
XVIII.C. K. Jaggi, and P. Verma,Joint optimization of price and order quantity withshortages for a two-warehouse system,Top (Spain),16 (2008) 195-213.
XIX.S.S. Sana, K.S. Chaudhuri, A deterministic EOQ model with delays in paymentsand price-discountoffers, Euro. J. Oper. Res.184 (2008) 509–533.
XX.Y.F. Huang, K.H. Hsu, An EOQ model under retailerpartial trade credit policy insupply chain, Int. J. Prod. Econ. 112 (2008) 655–664.
XXI.C.H. Ho, L.Y. Ouyang, C.H. Su, Optimal pricing, shipmentand payment policyfor an integrated supplier–buyer inventory model with two-part trade credit, Euro.J. Oper. Res. 187 (2008) 496–510.
XXII.C.C. Lee, S.L. Hsu, A two-warehouse production model for deterioratinginventory items withtime-dependent demands,Euro. J. Oper. Res. 194 (2009)700–710.
XXIII.C.K. Jaggi, K.K. Aggarwal, P. Verma, Inventory and pricing strategies fordeteriorating items with limited capacity and timeproportional backlogging rate,Int. J. Oper. Res. 8(3) (2010) 331-354.
XXIV.C.K. Jaggi, A. Khanna, Supply chain models fordeteriorating items with stockdependent consumption rate and shortages underinflation and permissible delayin payment,Int. J. Math. Opera. Res. 2(4) (2010) 491-514.
XXV.C.K. Jaggi, A. Kausar, Retailer’s ordering policy in a supply chain when demandis price and credit period dependent,Int. J. Strat. Dec. Sci. 2(4) (2011) 61-74.
XXVI.A.K. Bhunia, A.A. Shaikh,A two warehouse inventory model for deteriorating itemswith time dependent partial backlogging and variable demand dependent on marketingstrategy and time,International Journal of Inventory Control and Management, 1 (2011),95-110.
XXVII.A.K. Bhunia,P. Pal, S. Chattopadhyay, B. K.Medya, An inventory model oftwo-warehouse system with variable demand dependent on instantaneousdisplayed stock and marketing decisions via hybrid RCGA,Int. J. Ind. Eng.Comput. 2(2) (2011) 351-368.
XXVIII.C.K. Jaggi, A. Khanna, P. Verma,Two-warehouse partially backlogginginventory model for deteriorating items with linear trend in demand underinflationary conditions,Int. J. Syst.Sci. 42(7) (2011) 1185-1196.
XXIX.C.K. Jaggi, M. Mittal, Retailer’s ordering policy for deteriorating items withinitial inspection and allowable shortages under the condition of permissibledelay in payments,Int. J. Appl. Ind. Eng. 1(1) (2012) 64-79.
XXX.H.L. Yang, (2012), ‘Two-warehouse partial backlogging inventory models with threeparameter weibull .distribution deterioration under inflation’International Journal ofProduction Economics,138, 107-116.
XXXI.A.K. Bhunia,and A.A. Shaikh, A.K. Maiti, M. Maiti,A two warehousedeterministic inventory model for deteriorating items with a linear trend in timedependent demand over finite time horizon by Elitist Real-Coded Genetic Algorithm,InternationalJournal Industrial Engineering and Computations, 4(2013), 241-258
XXXII.A.K. Bhunia, A.A. Shaikh,R.K. Gupta, A study on two-warehouse partiallybacklogged deteriorating inventory models under inflation via particle swarmoptimization,International Journal of System Science.(to appear) 2013.
XXXIII.H.L. Yang, C.T. Chang, A two-warehouse partialbacklogging inventory model fordeteriorating items with permissible delay in payment under inflation’,AppliedMathematical Modelling,37(2013), 2717-2726.
XXXIV.K.J. Chung, T.S. Huang, The optimal retailer’s ordering policies for deterioratingitems with limited storage capacity under tradecredit financing, Int. J. Prod.Econ. 106 (2007) 127–145.
XXXV.Y. Liang, F. Zhou,A two-warehouse inventory model for deteriorating itemsunder conditionally permissible delay in payment,Appl. Math. Model. 35 (2011)2221-2231.
XXXVI.A.K. Bhunia, C. K. Jaggi, A. Sharma, R. Sharma, A two warehouse inventorymodel for deteriorating items under permissible delay in payment with partialbacklogging,Applied Mathematics and Computation, 232(2014), 1125-1137.
XXXVII. N.H. Shah, A.R. Patel, K.R. Lou, Optimal ordering and pricing policy for pricesensitive stock-dependent demand under progressive payment scheme,International Journal Industrial Engineering Computations, 2(2011), 523-532
View
Download