Abstract

In wide area monitoring system, phasor measurement units (PMUs) plays a vital role in providing synchronized measurements with the help of Global Positioning System (GPS). In conventional optimal PMU placement methodology these PMUs are placed optimally across the power system network ensuring completely observable.  It is found in literature, that most of them neglect the PMU channel limitations, variable PMU costs, and measurement redundancy improvement. To address this problem, in the present paper an optimal PMU problem is addressed by optimizing the two objective functions that are conflicting in nature, namely, minimization of PMU installation cost and maximization of measurement redundancy at the same time. In order to allocate PMUs, both channel limitation and variable cost of PMUs has been considered. A non-dominated sorting genetic algorithm-II (NSGA-II)based methodology is proposed to solve the combinatorial optimization problem. The Pareto optimal solution obtained using the concept of crowding distance and non-dominated sorting. A multi-criteria decision making technique based on VIKOR method is utilized for finding the best compromise solution from the set of Pareto-optimal solution obtained through NSGA-II. To verify the effectiveness and reliability, the proposed approach is tested on IEEE 14-bus, 30-bus, and 57-bus systems.

Refference:

I. A. Enshaee, R. A. Hooshmand, and F. H. Fesharaki, “A new method for optimal placement of phasor measurement units to maintain full network observability under various contingencies,” Electr. Power Syst. Res., vol. 89, pp. 1–10, 2012.

II. A. Mahari and H. Seyedi, “Optimal PMU placement for power system observability using BICA, considering measurement redundancy,” Electr. Power Syst. Res., vol. 103, pp. 78–85, 2013.

III. B. Milošević and M. Begović, “Nondominated sorting genetic algorithm for optimal phasor measurement placement,” IEEE Trans. Power Syst., vol. 18, no. 1, pp. 69–75, 2003.

IV. C. Chang, “A modified VIKOR method for multiple criteria analysis,” Environ. Monit. Assess., vol. 168, pp. 339–344, Sep. 2010.

V. C. Peng, H. Sun, and J. Guo, “Multi-objective optimal PMU placement using a non-dominated sorting differential evolution algorithm,” Int. J. Electr. Power Energy Syst., vol. 32, no. 8, pp. 886–892, 2010.

VI. C. Ruben, S. C. Dhulipala, A. S. Bretas, Y. Guan, and N. G. Bretas, “Multi-objective MILP model for PMU allocation considering enhanced gross error detection: A weighted goal programming framework,” Electr. Power Syst. Res., vol. 182, p. 106235, 2020.

VII. H. Manoharan, S. Srikrishna, G. Sivarajan, and A. Manoharan, “Economical placement of PMUs considering observability and voltage stability using binary coded ant lion optimization,” Int. Trans. Electr. Energy Syst., vol. 28, no. 9, pp. 1–19, 2018.
VIII. J. Aghaei, A. Baharvandi, A. Rabiee, and M. A. Akbari, “Probabilistic PMU Placement in Electric Power Networks: An MILP-Based Multiobjective Model,” IEEE Trans. Ind. Informatics, vol. 11, no. 2, pp. 332–341, 2015.

IX. J. Aghaei, A. Baharvandi, M. A. Akbari, K. M. Muttaqi, M. R. Asban, and A. Heidari, “Multi-objective Phasor Measurement Unit Placement in Electric Power Networks: Integer Linear Programming Formulation,” Electr. Power Components Syst., vol. 43, no. 17, pp. 1902–1911, 2015.

X. K. Arul jeyaraj, V. Rajasekaran, S. K. Nandha Kumar, and K. Chandrasekaran, “A multi-objective placement of phasor measurement units using fuzzified artificial bee colony algorithm, considering system observability and voltage stability,” J. Exp. Theor. Artif. Intell., vol. 28, no. 1–2, pp. 113–136, Mar. 2016.

XI. K. Deb, A. Pratap, S. Agarwal, and T. Meyarivan, “A fast and elitist multiobjective genetic algorithm: NSGA-II,” IEEE Trans. Evol. Comput., vol. 6, no. 2, pp. 182–197, Apr. 2002.

XII. K. Jamuna and K. S. Swarup, “Multi-objective biogeography based optimization for optimal PMU placement,” Appl. Soft Comput. J., vol. 12, no. 5, pp. 1503–1510, 2012.

XIII. M. Basu, “Dynamic economic emission dispatch using nondominated sorting genetic algorithm-II,” Int. J. Electr. Power Energy Syst., vol. 30, no. 2, pp. 140–149, 2008.

XIV. N. P. Theodorakatos, N. M. Manousakis, and G. N. Korres, “A sequential quadratic programming method for contingency-constrained phasor measurement unit placement,” Int. Trans. Electr. Energy Syst., vol. 25, no. 12, pp. 3185–3211, Dec. 2015.

XV. R. Babu and B. Bhattacharyya, “Strategic placements of PMUs for power network observability considering redundancy measurement,” Meas. J. Int. Meas. Confed., vol. 134, pp. 606–623, 2019.

XVI. S. M. Mazhari, H. Monsef, H. Lesani, and A. Fereidunian, “A multi-objective PMU placement method considering measurement redundancy and observability value under contingencies,” IEEE Trans. Power Syst., vol. 28, no. 3, pp. 2136–2146, 2013.

XVII. S. Opricovic and G.-H. Tzeng, “Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS,” Eur. J. Oper. Res., vol. 156, no. 2, pp. 445–455, Jul. 2004.

XVIII. S. P. Singh and S. P. Singh, “A Multi-objective PMU Placement Method in Power System via Binary Gravitational Search Algorithm,” Electr. Power Components Syst., vol. 45, no. 16, pp. 1832–1845, 2017.

XIX. S. Prasad and D. M. V. Kumar, “Robust meter placement for active distribution state estimation using a new multi-objective optimization model,” IET Sci. Meas. Technol., vol. 12, no. 8, pp. 1047–1057, 2018.

XX. V. Basetti and C. Ashwani Kumar, “Optimal Multi-Objective Hybrid Measurement Placement Using NSGA-II,” i-manager’s J. Power Syst. Eng., vol. 2, no. 3, p. 28, 2014.