An inventory model of flexible demand for price, stock and reliability with deterioration under inflation incorporating delay in payment

Authors:

Sudip Adak,G.S. Mahapatra,

DOI NO:

https://doi.org/10.26782/jmcms.2018.12.00010

Keywords:

Deterioration,Reliability,Credit period,Inflation,Delay payment,

Abstract

This paper presents an inventory model for deteriorating items with a constant rate of deterioration and the demand rate is flexible which depends on the price, stock as well as the reliability of the products. This model allowing the shortage under inflation, and delay in payment is also taken into account. We consider situation of the credit period is less than or greater than the cycle time for settling the account. Numerical example is given for different cases and sensitivity analysis is carried out to analyze the effect of the parameters on the optimal solution.

Refference:

I.A. Guria, B. Das, S. Mondal and M. Maiti,“Inventory policy for an item with inflation induced purchasing price, selling price and demand with immediate part payment”, Applied Mathematical Modelling, 37 (1-2), 240-257, 2013.

II.BenkheroufL., Z.T. Balkhi, “On an inventory model for deteriorating items and time-varying demand”, Mathematical Methods of Operations Research, 45(2), 221-233, 1997.

III.C.J. Chung and H.M. Wee, “Scheduling and replenishment plan for an integrated deteriorating inventory model with stock dependent selling rate”, International Journal of Advanced Management Technology, 35 (7-8), 665-679, 2008.

IV.C.K. Jaggi, P.K. Kapur, S.K. Goyal and S.K. Goel,”Optimalreplenishment and credit policy in EOQ model under two-levels of trade credit policy when demand is influenced by credit period”, International Journal of System Assurance Engineering and Management, 3(4), 352-359, 2012.

V.E.A. Elsayed and C. Teresi, “Analysis of inventory systems with deteriorating items”, International Journal of Production research, 21(4), 449-460, 1983.

VI.G. Janakiram, S. Sridhar, J.G. Shanthikumar, “A comparison of the optimal costs of two canonical inventory systems”, Operations Research, 55(5), 866-875, 2007.

VII.G.A. Widyadana and H.M. Wee, “Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time”,Applied Mathematical Modelling, 35, 3495-3508, 2011.

VIII.G.S. Mahapatra, T.K. Mandal and G.P. Samanta, “A production inventory model with fuzzy coefficients using parametric geometric programming approach”, International Journal of Machine Learning and Cybernetics, 2(2), 99-105, 2011.

IX.G.S. Mahapatra, T.K. Mandal and G.P. Samanta, “Fuzzy parametric geometric programming with application in fuzzy EPQ model under flexibility and reliability consideration”, Journal of Information and Computing Science, 7(3), 223-234, 2012.

X.G.S. Mahapatra, T.K. Mandal and G.P. Samanta, “An EPQ model with imprecise space constraint based on intuitionistic fuzzy optimization technique”, Journal of Multiple-Valued Logic and Soft Computing, 19(5-6), 409-423, 2012.

XI.G.S. Mahapatra, T.K. Mandal and G.P. Samanta, “EPQ model with fuzzy coefficient of objective and constraint via parametric geometric programming”, International Journal of Operational Research, 17(4), 436-448, 2013.

XII.G.S. Mahapatra, S. Adak, T.K. Mandal and S. Pal, “Inventory model for deteriorating items with time and reliability dependent demand and partial backorder”, International Journal of Operational Research, 29 (3), 344-359, 2017.

XIII.H.C. Liao, C.H. Tsai and C.T. Su, “An inventory model with deteriorating items under inflation when delay in payment is permissible”, International Journal of Production Economics, 63, 207-214, 2000.

XIV.H.J. Chang and C.Y. Dye, “An EOQ model for deteriorating items with time vary demand and partial backlogging”, Journal of Operational Research Society, 50, 1176-1182, 2001.

XV.H.M. Wee and S.T. Law, “Replenishment and pricing policy for deteriorating items taking into account the time value of money”, International Journal of Production Economics, 71, 213-220, 2001.

XVI.N.H.Shah and H. Soni, “A Multi-Object Production Inventory Model with Backorder for Fuzzy Random Demand Under Flexibility and Reliability”,Journal of Mathematical Modelling and Algorithms, 10 (4), 341-356, 2011.

XVII.K.J. Chung and C.N. Lin, “Optimal inventory replenishment models for deteriorating items taking account of time discounting”, Computer and Operations Research, 28, 67-83, 2001.XVIII.K.J. Chung and P.S. Ting, “A heuristic for replenishment for deteriorating items with a linear trend in demand”, Journal of Operational Research Society, 44, 1235-1241, 1993.

XIX.K.L. Hou, “An inventory model for deteriorating items with stock-dependent consumption rate and shortage under inflation and time discounting”,European Journal of Operational research, 168, 463-474, 2006.

XX.J.J. Liao and K.N. Huang, “An inventory model for deteriorating items with two levels of trade credit taking account of time discounting”, Acta Application Mathematics, 110(1), 313-326, 2010.

XXI.J.M. Chen, “An EOQ model for deteriorating items withtime-proportional demand and shortages under inflation and time discounting”, International Journal of Production Economics, 55, 21-30, 1998.

XXII.J. Sicilia, L.A. San-Jose and J. Garcia-Laguna, “An inventory model where backordered demand ratio is exponentially decreasing with the waiting time”, Annals of operations research, 19 (1), 137-155, 2012.

XXIII.P.K. Tripathy, W.M.Wee and P.R. Majhi, “An EOQ model with process reliability consideration”, Journal of Operational Research Society, 54, 549-554, 2003.

XXIV.R.B. Misra, “Optimum production lot size model for a system with deteriorating inventory”, International Journal of Production Research, 13, 495-505, 1975.

XXV.R.I. Levin, C.P. McLaughlin, R.P. Lamone and J.F. Kottas, “Production/Operations Management: Contemporary Policy for Managing Operating System”, McGraw-Hill, New York.

XXVI.S. Khanra, S.K. Ghosh and K.S. Chaudhuri,”An EOQ model for a deteriorating item with time dependent quadratic demand rate under permissible delay in payment”, Applied Mathematics and Computation, 218, 1-9, 2011.

XXVII.S. Pal, A. Goswami and K.S. Chaudhuri, “A deterministic inventory model for deteriorating items with stock dependent demand rate”, International Journal of Production Economics, 32, 291-99, 1993.

XXVIII.S. Pal, G.S. Mahapatra and G.P. Samanta, “An EPQ model of ramp type demand withWeibull deterioration under inflation and finite horizon in crisp and fuzzy environment”, International Journal of Production Economics, 156, 159-166, 2014.

XXIX.S. Pal, G.S. Mahapatra and G.P. Samanta, “An Inventory Model of Price and Stock dependent Demand Rate with Deterioration under Inflation and Delay in payment”, International Journal of System Assurance Engineering and Management, 5(4), 591-601, 2014.

XXX.S. Pal, G.S. Mahapatra and G.P. Samanta, “A production inventory model for deteriorating item with ramp type demand allowing inflation and shortages under fuzziness”, Economic Modelling, 46, 334-345, 2015.

XXXI.S. Pal, G.S. Mahapatra, G.P. Samanta, “A Three-Layer Supply Chain EPQ Model for Price-and Stock-Dependent Stochastic Demand with Imperfect Item Under Rework”, Journal of Uncertainty Analysis and Applications, 4 (1), 10, 2016.

XXXII.S. Pal, and G.S. Mahapatra, “A manufacturing-oriented supply chain model for imperfect quality with inspection errors, stochastic demand under rework and shortages”, Computers & Industrial Engineering, 106, 299-314, 2017.

XXXIII.S.H. Kim, M.A. Cohen and S. Netessine, “Performance contracting in after-sales service supply chains”, Management Science, 53 (12), 1843-1858, 2007.

XXXIV.S.K. Goyal, “EOQ under conditions of permissible delay in payments”, Journal of Operation Research Society, 36, 335-338, 1985.

XXXV.S.K. Manna, K.S. Chaudhuri, “An EOQ model with ramp type demand rate time dependent deterioration rate, unit production cost and shortage”, European Journal of Operational research, 171, 557-566, 2006.

XXXVI.S.S. Sana and K.S. Chaudhuri, “A deterministic EOQ model with delays in payments and price discount offers”, European Journal of Operational research, 184, 509-533, 2008.

XXXVII.T. Jin and H. Liao,“Spare parts inventory control considering stochastic growth of an installed base”, Computers & Industrial Engineering, 56 (1), 452-460, 2009.

XXXVIII.T. Roy and K.S. Chaudhuri,“An EPLS model for a variable production rate with stock-pricesensitive demand and deterioration”,Yugoslav Journalof Operations Research, 21, 1-13, 2011.

XXXIX.T.K. Datta, A.K. Pal, “Deterministic inventory system for deteriorating items with inventory level-dependent demand rate and shortages”, Opsearch, 27, 213.224, 1990.

Author(s): Sudip Adak, G.S. Mahapatra View Download